Avenue O Building D

Chicago, Illinois

OWNER

Northpoint Development

CLIENT

Northpoint Development

REVENUE

$292,000

TIME

2020

D.CaseStudies IMG 0246 WEB2
GRIFFIN DIFFERENCE

Griffin has worked at the site before and had the experience to properly design the system and bring the right equipment for installation, the first time. Griffin successfully installed the dewatering system and achieved the required drawdown while maintaining communication and excellent relations with the Client.

THE CHALLENGE

Difficult soil conditions consisting of urban fill terminating at a clay layer 19 ft. below ground surface and a 25 ft. setback from the Critical Zone as determined by the railroad.

THE SOLUTION

Griffin installed the system using our Track Punch Jetting Tool for wellpoints. This allowed us to install through the variable soils by allowing additional downward pressure during jetting, and providing a cased hole for well construction. Based on our experience in the area we installed extra wellpoints to dewater the mid-point of the bore under the railroad.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber
Mill Creek Diversion Chamber
Learn How >
L-536 Levee Outlet Structures
L-536 Levee Outlet Structures
Learn How >
Buzzard Point
Buzzard Point
Learn How >
One Kings Bay Submarine Base
One Kings Bay Submarine Base
Learn How >
Rose Way Industrial Park
Rose Way Industrial Park
Learn How >
Clarke Creek Pump Station
Clarke Creek Pump Station
Learn How >
Project Bruin
Project Bruin
Learn How >
Fort Lauderdale Aquatic Complex (FLAC)
Fort Lauderdale Aquatic Complex (FLAC)
Learn How >
Lifetime Parking Garage and Facility
Lifetime Parking Garage and Facility
Learn How >
Des Moines University Slope Stabilization
Des Moines University Slope Stabilization
Learn How >