Block 58 Skyscraper

Houston, Texas

CLIENT

The Gilbane Building Company

OWNER

Hines

PROJECT REVENUE

$100K

TIME

2018- 2019

D.CaseStudies Block 58 Houston TX Web
GRIFFIN DIFFERENCE

Griffin provided a solution that minimized impact on construction access to a very
tight project site. Griffin’s discharge pipe was suspended above construction grade
from the excavation walls to maximize site access. Griffin proposed a solution under a minimum plus model. We mobilized with the plan of putting in the system that we believed would be sufficient if the site assumptions that were made were accurate. We provided a cost for additional wells (if needed) to create an equitable risk share with regard to the dewatering efforts.

THE CHALLENGE

An excavation of significant depth (30+ feet) in downtown Houston was challenged by hydrostatic uplift pressure. The site had only one access point and use of space was a continual concern. The main slab of the foundation could not be poured without dewatering and relieving the hydrostatic pressure. prevent the pumping of fines from the wells.

THE SOLUTION

Griffin provided groundwater management for the construction of the deep
foundation. Griffin installed 8 deep wells from 25 ft. below grade to relieve artesian
pressure in underlying sand. Wells were drilled to approximately 50 ft. below working grade by bucket auger and connected to a discharge header suspended from the excavation walls to maximize Gilbane’s access to the site. Griffin completed the system with several mobilizations to fit the clients schedule for needing to access the site.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber
Mill Creek Diversion Chamber
Learn How >
L-536 Levee Outlet Structures
L-536 Levee Outlet Structures
Learn How >
Buzzard Point
Buzzard Point
Learn How >
One Kings Bay Submarine Base
One Kings Bay Submarine Base
Learn How >
Rose Way Industrial Park
Rose Way Industrial Park
Learn How >
Clarke Creek Pump Station
Clarke Creek Pump Station
Learn How >
Project Bruin
Project Bruin
Learn How >
Fort Lauderdale Aquatic Complex (FLAC)
Fort Lauderdale Aquatic Complex (FLAC)
Learn How >
Lifetime Parking Garage and Facility
Lifetime Parking Garage and Facility
Learn How >
Des Moines University Slope Stabilization
Des Moines University Slope Stabilization
Learn How >