College Park-Gateway

College Park, Maryland

OWNER

Buzzuto Development

CLIENT

Buzzuto Construction

CLIENT

Bohler Engineering

TIME

2020-2021

REVENUE

$157,500

D.CaseStudies Buzzard Point 20200925 104827 Web 2048x1151 1
GRIFFIN DIFFERENCE

Griffin’s relationship with client and vast experience in the area was invaluable in assisting the client in their decision.

We emphasized Griffin’s long history of successful projects. Griffin’s accumulated knowledge of soil and groundwater conditions in the metro Washington area is exceptional and assisted Griffin with designing and implementing a system that allowed the project to proceed on-time and on-budget.

THE CHALLENGE

Aster College Park is a new mixed-use community in Prince George’s County, MD. Difficult fine grained soils and potential refusal indicated gravel packed wells and sumping as the best methodology.

THE SOLUTION

After an onsite meeting with the client, it was determined the conditions warranted the installation of deep wells.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber
Mill Creek Diversion Chamber
Learn How >
L-536 Levee Outlet Structures
L-536 Levee Outlet Structures
Learn How >
Buzzard Point
Buzzard Point
Learn How >
One Kings Bay Submarine Base
One Kings Bay Submarine Base
Learn How >
Rose Way Industrial Park
Rose Way Industrial Park
Learn How >
Clarke Creek Pump Station
Clarke Creek Pump Station
Learn How >
Project Bruin
Project Bruin
Learn How >
Fort Lauderdale Aquatic Complex (FLAC)
Fort Lauderdale Aquatic Complex (FLAC)
Learn How >
Lifetime Parking Garage and Facility
Lifetime Parking Garage and Facility
Learn How >
Des Moines University Slope Stabilization
Des Moines University Slope Stabilization
Learn How >