L-550 Rock Creek Drainage

Langdon, Missouri

CLIENT

JJ Westhoff Construction

OWNER

United States Army Corps of Engineers

PROJECT REVENUE

$209K

TIME

2021-2022

D.CaseStudies L550 Rock Creek Drainage Web
GRIFFIN DIFFERENCE

Griffin had previously completed several other structures very similar in size and scope in the area, so Griffin was able to turn around a bid and subsequent submittal quickly. The USACE representatives on this project were especially attentive to detail. With Griffin’s past experience we were able to get the USACE exactly what they needed to get the work approved.

Once approved, Griffin had a very short schedule to install and pull together manpower, equipment, and materials. Not only did Griffin accomplish this in a short time frame, but Griffin delivered a successful dewatering system that dried up the site as designed.

THE CHALLENGE

The work for this fast tracked project took place in an existing drainage ditch that needed to remain in use during construction activities. The area was also surrounded by existing levees and was in close proximity to existing relief wells. The dewatering wells had to be located such that they were not in the levee toe or within 40 ft. of an existing relief well.

THE SOLUTION

The general contractor had to competitively seek out qualified bidders to handle the dewatering efficiently and effectively. Griffin’s plan was ultimately selected for being the most responsive, complete, and capable bid, even though it was not the lowest cost. Griffin’s design consisted of deep wells, a dual generator system with auto switch gear, and telemetry to remotely determine flows and notify the team in case of generator failure or a decrease in groundwater flow.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber
Mill Creek Diversion Chamber
Learn How >
L-536 Levee Outlet Structures
L-536 Levee Outlet Structures
Learn How >
Buzzard Point
Buzzard Point
Learn How >
One Kings Bay Submarine Base
One Kings Bay Submarine Base
Learn How >
Rose Way Industrial Park
Rose Way Industrial Park
Learn How >
Clarke Creek Pump Station
Clarke Creek Pump Station
Learn How >
Project Bruin
Project Bruin
Learn How >
Fort Lauderdale Aquatic Complex (FLAC)
Fort Lauderdale Aquatic Complex (FLAC)
Learn How >
Lifetime Parking Garage and Facility
Lifetime Parking Garage and Facility
Learn How >
Des Moines University Slope Stabilization
Des Moines University Slope Stabilization
Learn How >