Griffin installed the dewatering system on schedule and withing budget. Griffin continued to monitor the dewatering system throughout the project and made sure contractor was operating and maintaining the system properly.

THE CHALLENGE

Lowering groundwater 15 ft. below ground surface for an excavation of approximately 250 ft x 50 ft.

THE SOLUTION

A wellpoint dewatering system was installed surrounding the proposed excavation’s approximately 600 ft. perimeter. Griffin installed 85 wellpoints at approximate spacing of 7 ft. to a depth of 30 ft. One operating and one standby wellpoint pump were utilized for the project.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber
Mill Creek Diversion Chamber
Learn How >
L-536 Levee Outlet Structures
L-536 Levee Outlet Structures
Learn How >
Buzzard Point
Buzzard Point
Learn How >
Rose Way Industrial Park
Rose Way Industrial Park
Learn How >
Clarke Creek Pump Station
Clarke Creek Pump Station
Learn How >
Project Bruin
Project Bruin
Learn How >
Fort Lauderdale Aquatic Complex (FLAC)
Fort Lauderdale Aquatic Complex (FLAC)
Learn How >
Lifetime Parking Garage and Facility
Lifetime Parking Garage and Facility
Learn How >
Des Moines University Slope Stabilization
Des Moines University Slope Stabilization
Learn How >
Texas Medical Center
Texas Medical Center
Learn How >