Petmin Pig Iron Plant

Ashtabula, Ohio

CLIENT

Beaver Excavating

OWNER

Petmin

TIME

2020- 2021

REVENUE

$600,000

D.CaseStudies Petmin 3
GRIFFIN DIFFERENCE

The equipment Griffin provided. We used multiple electric-powered wellpoint pumps (3), a diesel-powered standby pump, winterization equipment consisting of “Thawzall Ground Heating Units” with glycol lines next to the header pipe, discharge pipe and around the pumps with concrete blankets covering the piping and around the pumps. We provided local Union help to meet a stipulation in Bidding Documents to provide local labor participation.

THE CHALLENGE

Winter installation/operation on Lake Erie, upper fill material to jet through and a high impermeable layer at or near subgrade. Large footprint for building requires multiple pumps running.

THE SOLUTION

Griffin provided Trackpunch jetting installation of a wellpoint system around the perimeter of the foundation to the impermeable layer. Soils were fine in nature and required a sand filter pack enveloping the wellpoint screen and up to the surface to help drain layers of fill.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber
Mill Creek Diversion Chamber
Learn How >
L-536 Levee Outlet Structures
L-536 Levee Outlet Structures
Learn How >
Buzzard Point
Buzzard Point
Learn How >
One Kings Bay Submarine Base
One Kings Bay Submarine Base
Learn How >
Rose Way Industrial Park
Rose Way Industrial Park
Learn How >
Clarke Creek Pump Station
Clarke Creek Pump Station
Learn How >
Project Bruin
Project Bruin
Learn How >
Fort Lauderdale Aquatic Complex (FLAC)
Fort Lauderdale Aquatic Complex (FLAC)
Learn How >
Lifetime Parking Garage and Facility
Lifetime Parking Garage and Facility
Learn How >
Des Moines University Slope Stabilization
Des Moines University Slope Stabilization
Learn How >