GRIFFIN DIFFERENCE

Griffin provided a turn-key dewatering solution. Pre-Construction Planning and analysis resulted in a truly collaborative effort to find the safest, most cost-effective dewatering method.

THE CHALLENGE

The project location borders the Raritan River and an NJ Transit railroad. The high-profile location, with high pedestrian and vehicular traffic, plus high-powered utilities along the perimeter – made dewatering a challenge.

THE SOLUTION

Griffin utilized groundwater modeling data to create a custom dewatering solution based on the unique site requirements. Griffin used the data to design a combination wellpoint and sump pump dewatering system. Griffin designed and installed a 640lf perimeter wellpoint dewatering system to dewater the excavation during construction. The installed system successfully achieved the required drawdowns.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber
Mill Creek Diversion Chamber
Learn How >
L-536 Levee Outlet Structures
L-536 Levee Outlet Structures
Learn How >
Buzzard Point
Buzzard Point
Learn How >
One Kings Bay Submarine Base
One Kings Bay Submarine Base
Learn How >
Rose Way Industrial Park
Rose Way Industrial Park
Learn How >
Clarke Creek Pump Station
Clarke Creek Pump Station
Learn How >
Project Bruin
Project Bruin
Learn How >
Fort Lauderdale Aquatic Complex (FLAC)
Fort Lauderdale Aquatic Complex (FLAC)
Learn How >
Lifetime Parking Garage and Facility
Lifetime Parking Garage and Facility
Learn How >
Des Moines University Slope Stabilization
Des Moines University Slope Stabilization
Learn How >