SLC Airport Central Tunnel

Salt Lake City, Utah

2023 TDI DEWATERING CONTRACTOR OF THE YEAR FINALIST

CLIENT

R.L. Wadsworth

OWNER

Silverstrand Construction

REVENUE

$1,000,000

TIME

2021-2022

D.CaseStudies SLC Airport Header Web
GRIFFIN DIFFERENCE

Griffin’s design to depressurize the underlying alluvium formation performed very well and helped the contractor maintain an aggressive project schedule. Griffin provided a turn-key solution and completed all dewatering permitting, design, submittal, and installation. Griffin’s deep well system design was optimized for the difficult dewatering conditions at the site. Large diameter wells were drilled up to 50 ft. below the excavation depth to depressurize the underlying soils and pump high volumes of water.

THE CHALLENGE

A deep 35 ft. excavation with sheet pile shoring was required for this project. Highly stratified soils and underlying alluvium caused difficult dewatering conditions. Unstable soils near the planned excavation depth further complicated the tunnel construction. Water treatment for hydrocarbon contamination was also required for several wells.

THE SOLUTION

Griffin designed and installed a deep well dewatering system to target the coarse alluvium from 45 ft. to 85 ft. below grade. Large diameter wells were drilled and completed to 85 ft. below grade to depressurize the formation below the tunnel excavation. The dewatering system produced approximately 550 GPM and the depressurization of the formation provided a successful project with limited sumping. Temporary water treatment was required to remove hydrocarbon contaminants from the effluent of several wells. Griffin also designed and installed the temporary treatment system for this project.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber
Mill Creek Diversion Chamber
Learn How >
L-536 Levee Outlet Structures
L-536 Levee Outlet Structures
Learn How >
Buzzard Point
Buzzard Point
Learn How >
One Kings Bay Submarine Base
One Kings Bay Submarine Base
Learn How >
Rose Way Industrial Park
Rose Way Industrial Park
Learn How >
Clarke Creek Pump Station
Clarke Creek Pump Station
Learn How >
Project Bruin
Project Bruin
Learn How >
Fort Lauderdale Aquatic Complex (FLAC)
Fort Lauderdale Aquatic Complex (FLAC)
Learn How >
Lifetime Parking Garage and Facility
Lifetime Parking Garage and Facility
Learn How >
Des Moines University Slope Stabilization
Des Moines University Slope Stabilization
Learn How >