St. Joseph Hospital Expansion

Tampa, Florida

OWNER

BayCare

GC

Robins & Morton

REVENUE

$510,000

TIME

2018-2019

module background 2
GRIFFIN DIFFERENCE

Griffin tested design assumptions to verify system performance. Due to changed site conditions, Griffin modified the system during installation to achieve drawdown. The dewatering system was installed, with the new design, within the allotted contract time, allowing construction to proceed on schedule.

THE CHALLENGE

An engineered dewatering solution was required to lower groundwater below the proposed 26 ft. deep excavation during the Hospital expansion project. Significant loss of circulation was shown in the limestone underlying the site, which could contribute very high flows to the dewatering effort.

THE SOLUTION

Griffin designed a high-capacity deep well dewatering system to assist in the control of groundwater. Upon partial installation, Griffin performed a pump test to verify design assumptions.

The pump test showed no contribution from the underlying limestone. Due to the low permeability of the sand, the dewatering approach was modified to a perimeter wellpoint system.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber
Mill Creek Diversion Chamber
Learn How >
L-536 Levee Outlet Structures
L-536 Levee Outlet Structures
Learn How >
Buzzard Point
Buzzard Point
Learn How >
One Kings Bay Submarine Base
One Kings Bay Submarine Base
Learn How >
Rose Way Industrial Park
Rose Way Industrial Park
Learn How >
Clarke Creek Pump Station
Clarke Creek Pump Station
Learn How >
Project Bruin
Project Bruin
Learn How >
Fort Lauderdale Aquatic Complex (FLAC)
Fort Lauderdale Aquatic Complex (FLAC)
Learn How >
Lifetime Parking Garage and Facility
Lifetime Parking Garage and Facility
Learn How >
Des Moines University Slope Stabilization
Des Moines University Slope Stabilization
Learn How >